Grand Marina Bason fully benefits when completing Thu Thiem 2 bridge through District 1

Thu Thiem 2 bridge across the Saigon River, with a total capital of nearly 3,100 billion VND, has just been completed, connecting Thu Duc City with District 1, expected to be exploited in the second quarter of next year.

Hop Long Thu Thiem Bridge 2

On the afternoon of September 2, a representative of Dai Quang Minh Real Estate Investment Joint Stock Company (investor) said that the project has completed the installation of AS16 beam burning - the last beam in 17 steel beams of the main bridge. across the Saigon River. After the installation of this beam is completed, the main span of the cable-stayed bridge of Thu Thiem 2 bridge has connected the two sides of the river.

Grand Marina Bason - Hop Long Thu Thiem Bridge 2 through District 1, a milestone in the price increase for the project

Thu Thiem 2 Bridge connects Thu Duc City through District 1, photo from Dai Quang Minh Real Estate Investment Joint Stock Company

Thu Thiem 2 Bridge is a key and urgent project, so the People's Committee of Ho Chi Minh City allows investors to maintain construction during the time of tightening distance measures to prevent Covid-19. The construction site is currently organizing "3 on-site", all officers, engineers and workers must periodically test. This is to ensure continuous construction workers and safety against epidemics.

According to the investor, in the coming time, maintaining and mobilizing personnel, especially the construction of beams and towers, etc. will be a big challenge because Covid-19 is still complicated. The prolonged implementation of "3 on-site" also causes many difficulties for contractors. However, the goal is to complete the main bridge by the end of this year to put it into operation in the second quarter of next year.

Thu Thiem 2 bridge is more than 1.4 km long, of which the bridge is 886 m long with 6 lanes; cable-stayed design with main tower 113 m high. The project is implemented in the form of BT (build - transfer), broke ground in 2015. Initially, the city expected the bridge to be completed in 2018, but encountered many problems, so the appointment was delayed.

In addition to Thu Thiem 2 bridge, there are currently 6 urgent projects under construction to avoid delay, including: Metro No. 1 (Ben Thanh - Suoi Tien); overpass in front of the new Eastern Bus Station; construction of technical infrastructure in 9 land lots Functional Zone No. 1 in Thu Thiem New Urban Area (Thu Duc City); tunnel project at the intersection of Nguyen Van Linh - Nguyen Huu Tho (district 7); construction works at Children's Hospital 1 (District 10); Tan Son Nhat airport runway project.

Perspective of bridge formation 

Grand Marina Bason - Hop Long Thu Thiem Bridge 2 through District 1, a landmark of outstanding price increase for the project.

Grand Marina Bason enjoys the perfect location

Super apartment project Grand Marina Saigon (Masterise Homes District 1) is designed and planned to become a closed high-end complex in accordance with the planning of the Department of Planning and Architecture of Ho Chi Minh City. HCM. According to the plan, the Ba Son port subdivision (Masterise Homes BaSon) will be made full use of the Saigon riverbank to form green parks, entertainment and community spaces.

Grand Marina Saigon Bason - nice perspective

Grand Marina Saigon Bason – beautiful perspective

Located in a "unique" location, frontage No. 2 Ton Duc Thang - Next to Thu Thiem 2 Bridge, Grand Marina Saigon possesses all the most advanced advantages. Create memorable moments for a refined life for the first time in Vietnam. The project is surrounded by the splendor of peaceful green vegetation, peaceful Saigon riverbank, a complex of carefully designed artworks reminiscent of history and looking to the future; on the basis of perfect comfort with a system of luxury shopping centers and restaurants.

Progress of Grand Marina Saigon July 2021

Progress of Grand Marina Saigon July 2021

Project contact: 

Hotline/Zalo: 0911 525 454

Project website: https://masterisesaigon.com/

NEW POSTS

THE GLOBAL CITY URBAN AREA - PROJECT UPDATE PROGRESS FEBRUARY 2023

Update the progress of The Global City urban area project in District 2 in March 2023

Masterise Homes Hanoi: welcome more than 1,000 real estate brokers & 33 agents to participate in the event

Masterise Homes Hanoi: welcome more than 1,000 real estate brokers & 33 agents to participate in the event

MASTERISE HOMES RECEIVES AN AWARD WINNER FROM VIETNAM REAL ESTATE ENGINEERING MAGAZINE

Masterise Homes honored in Top 10 Top Real Estate Developers in Vietnam

Real estate projects along Metro Line 1 still increase in price after many years of handing over

Update progress of Grand Marina project, Saigon in March 2023

Progress in March_2023 LUMIÈRE Boulevard, Masterise Homes officially topped off the project

March 7 – Topping out ceremony of LUMIÈRE Boulevard project from Masterise Homes

Masterise Homes officially topped off The Ritz-Carlton Residences Hanoi luxury apartment complex

Masterise Homes officially topped off The Ritz-Carlton Residences Hanoi luxury apartment complex